Sold Out
Book Categories |
1 | Introduction to Motion and Time Study | 1 |
Questions | 6 | |
2 | Motion and Time Study for the Lean Environment | 8 |
The Nature of the Lean Environment | 8 | |
Approaches to Quality Measurement and Improvement | 16 | |
Planning and Scheduling the Production System | 17 | |
Steps toward Establishing a Lean Manufacturing Environment | 20 | |
The Use of Motion Study Tools to Improve the Environment | 22 | |
The Use of Time Study Tools to Maintain the Lean Environment | 23 | |
Measures of Performance within the Lean Environment | 24 | |
Questions | 25 | |
3 | History of Motion and Time Study | 26 |
Frederick W. Taylor (1856-1915) | 27 | |
Frank (1868-1924) and Lillian (1878-1972) Gilbreth | 29 | |
Henry Laurence Gantt (1861-1919) | 31 | |
Harrington Emerson (1853-1931) | 31 | |
Ralph M. Barnes (1900-1984) | 32 | |
Marvin E. Mundel (1916-1996) | 32 | |
Shigeo Shingo (1909-1990) | 33 | |
Professor Elton Mayo | 33 | |
Controversy | 35 | |
Questions | 36 | |
4 | The Importance and Uses of Motion and Time Study | 37 |
What Is a Motion Study? | 37 | |
The Importance and Uses of Motion Study | 40 | |
What Is a Time Standard? | 41 | |
The Importance and Uses of Time Study | 43 | |
Techniques of Time Study | 57 | |
Questions | 66 | |
5 | Techniques of Methods Design: The Product Flow Macromotion | 67 |
Introduction | 67 | |
Cost Reduction Formula | 67 | |
Flow Diagrams | 69 | |
Step-by-Step Procedure for Developing a Flow Diagram | 72 | |
Notes About the Examples | 72 | |
The Operations Chart | 72 | |
Step-by-Step Procedures for Preparing an Operations Chart | 74 | |
Process Chart | 75 | |
Notes About the Examples | 78 | |
Step-by-Step Description for Using the Process Chart | 79 | |
Flow Process Chart | 83 | |
Work Cell Load Chart | 83 | |
Route Sheet | 87 | |
Questions | 89 | |
6 | Techniques of Micromotion Study: Operations Analysis | 90 |
Operations Analysis Chart | 91 | |
Operator/Machine Chart | 93 | |
Gang Chart | 100 | |
Multimachine Chart | 101 | |
Left-Hand/Right-Hand Chart | 102 | |
SIMO Chart | 103 | |
Questions | 106 | |
7 | Motion Study: The Work Station Design | 108 |
Work Station Design | 109 | |
Principles of Motion Economy | 111 | |
Motion Patterns | 126 | |
Questions | 128 | |
8 | Predetermined Time Standards (PTS) Systems | 129 |
Introduction | 129 | |
Methods Time Measurement (MTM) Family | 131 | |
MODAPTS | 131 | |
Predetermined Time Standards System (PTSS) | 136 | |
Questions | 153 | |
9 | Stopwatch Time Study | 159 |
Introduction | 159 | |
Tools of Stopwatch Time Study | 161 | |
Time Study Procedure and the Step-by-Step Form | 172 | |
Rating Leveling and Normalizing | 185 | |
100% Standards and Experiments | 187 | |
Time Study Rater Trainer Form | 192 | |
Allowances | 196 | |
Foreign Elements | 202 | |
Long Cycle Time Study | 204 | |
Vertical Time Study Form and Problem | 207 | |
Time Study Practices and Employee Relations | 209 | |
Questions | 210 | |
10 | Standard Data and Its Uses in Balancing Work | 212 |
Introduction | 212 | |
Definition | 213 | |
Advantages | 213 | |
Methods of Communicating Standard Data Time Standards | 214 | |
Work Cell, Assembly Line, and Plant Balancing | 230 | |
Questions | 252 | |
11 | Work Sampling | 254 |
Elemental Ratio Studies | 255 | |
Performance Sampling Studies | 266 | |
Time Standard Development Studies | 268 | |
Process Effectiveness Studies | 270 | |
Questions | 274 | |
12 | Indirect Labor and Motion and Time Study | 275 |
Developing Measures/or Indirect Labor | 276 | |
Material Handling | 278 | |
Quality Control | 279 | |
Manufacturing Plant and Industrial Engineering | 280 | |
Supervision | 280 | |
Maintenance and Tooling | 280 | |
Warehousing and Shipping | 281 | |
Receiving and Stores Department | 284 | |
Factory/Clerical | 285 | |
Other Indirect Areas | 285 | |
Questions | 286 | |
13 | Performance Control Systems | 287 |
The Functions of Any Control System | 287 | |
Expert Opinion Standards System | 290 | |
Backlog | 290 | |
Time Card System | 293 | |
Questions | 301 | |
14 | Wage Payment Systems | 302 |
Salaries: Hourly, Weekly, or Monthly | 302 | |
Incentive Systems and Commissions | 305 | |
The Two Types of Incentive Systems: Individuals and Group | 309 | |
Questions | 318 | |
15 | Time Management Techniques | 319 |
Be Creative | 320 | |
Be Selective | 320 | |
Delegate | 321 | |
Do It Now | 322 | |
Set Time Standards for Yourself | 322 | |
Eliminate the Unnecessary | 322 | |
Respect Other People's Time | 323 | |
Do Not Rationalize | 323 | |
Questions | 324 | |
16 | Attitudes and Goals for Industrial Engineers | 325 |
Attitudes of an Industrial Engineer | 325 | |
Goals | 330 | |
Questions | 332 | |
Appendix A | Forms | 333 |
Appendix B | Answers to Problems | 353 |
Index | 365 |
Login|Complaints|Blog|Games|Digital Media|Souls|Obituary|Contact Us|FAQ
CAN'T FIND WHAT YOU'RE LOOKING FOR? CLICK HERE!!! X
You must be logged in to add to WishlistX
This item is in your Wish ListX
This item is in your CollectionMotion and Time Study for Lean Manufacturing
X
This Item is in Your InventoryMotion and Time Study for Lean Manufacturing
X
You must be logged in to review the productsX
X
X
Add Motion and Time Study for Lean Manufacturing, Motion and Time Study for Lean Manufacturing, Third Edition, offers step-by-step procedures, forms, and practical advice on uses of time standards, motion-study techniques, and time-study questions. It covers other topics such as workstation des, Motion and Time Study for Lean Manufacturing to the inventory that you are selling on WonderClubX
X
Add Motion and Time Study for Lean Manufacturing, Motion and Time Study for Lean Manufacturing, Third Edition, offers step-by-step procedures, forms, and practical advice on uses of time standards, motion-study techniques, and time-study questions. It covers other topics such as workstation des, Motion and Time Study for Lean Manufacturing to your collection on WonderClub |